Working, working all weekend...  Now we have ripped down all old wallpapers, ceiling materils, extra walls etc. from upstairs.  Plan is to make upstairs as ready as possible before we move in.  So the dusty part is now done.  We already took one load to the dumping place (Sorttiasema) but more is going.  And one thing is already finished!  The first thing we did at the house was to move one door to get terrace access to the kitchen.  Grandpa finalised that yesterday and put the panelling back outside.  At the same time we made a new window for the upstairs toilet (where the old door used to be).  Toilet is still in original condition, we need that :-)  But of course that's one thing that really needs to be ready before moving in.

Planning lightning, kitchen, kitchen machines, fireplace re-shaping, curtain mechanism, electrification (where to put sockets), colours everywhere, garden, etc. Oh my...  And there's one party this week which needs a bit attention.  Next week we are in Saarenmaa.  Luckily I'm at work today!